The document is intended to guide the client and designer through the design process and through the considerations that are necessary to produce safe and effective designs. The document is also intended to provide the contractor with options for carrying out the works that will ensure the safety of the workers and the public. Additionally the document presents duties for the owners of lines (utilities).